Description
Summit Avenue from Snelling Avenue to Lexington Avenue will be resurfaced through a process called mill and overlay to create a smoother roadway surface. Crews grind off the top layer of roadway, then replace it with a new layer of bituminous pavement.

PLEASE NOTE: The Summit Avenue Resurfacing project is being done to improve the condition of the existing roadway. As part of all resurfacing projects, pedestrian improvements are installed. This current resurfacing project does not suggest nor prevent any future decisions about the design and construction of trail, sidewalk, or road on Summit Avenue as relates to the Summit Avenue Regional Trail Master Plan.

The Parks and Recreation Department is currently engaging the community to develop the Summit Avenue Regional Trail Master Plan along the entire corridor.

Location
Summit Avenue from Snelling Avenue to Lexington Avenue

Timeline
Fall 2022

Update 9/6: Mill and overlay (resurfacing) temporarily delayed. Dates are tentative.

Summit Avenue – Snelling Avenue to Hamline Avenue

Milling –  Completed September 16

Paving – Completed September 21 

Summit Avenue – Hamline Avenue to Lexington Parkway

Milling – Completed September 16

Paving – Completed September 22  

Tags

    Pedestrian Improvements

    In advance of the mill and overlay of Summit Avenue, pedestrian improvements will be done in needed areas. Construction work began June 13, 2022.

    Pedestrian improvements include:

    • Curb bump outs at intersections
    • Pedestrian ramps
    • Sidewalk replacement

    Project Updates

    Summit Avenue Regional Trail Master Plan

    The City Parks and Recreation Department is currently engaging community members to inform and develop a Master Plan for Summit Avenue that reviews the corridor from the Mississippi River to Downtown Saint Paul. This master plan will evaluate opportunities, constraints, and feasibility of a regional trail facility within the corridor and will serve as a guide to future transportation, pedestrian, and parkway improvements.  

    During the process, there will be emphasis on developing a preferred cross section for the Lexington to Victoria segment, planned for reconstruction in 2023. 

    Visit the Summit Avenue Regional Trail Master Plan to learn more and share your thoughts.