Description
The project is reconstructing Wheelock Parkway from Edgerton Street to Arcade Street to replace the roadway pavement, sidewalks, curbs, and underground utilities including water and sewer.

Additional project benefits:  

  • ADA-compliant pedestrian ramps
  • Boulevard trees - to be planted after street construction
  • Concrete outwalks and driveway aprons
  • Lantern-style street lighting
  • Private utility upgrades
  • Water main upgrades
  • Public art
  • Sodded boulevards
  • Storm sewer catch basins

Location
Wheelock Parkway from Edgerton Street to Arcade Street

Timeline
2022 - 2024

Tags

    Construction is Underway

    • Westbound Wheelock Parkway will be closed between Walsh Street and Nevada Avenue for sewer work
    • Closure begins on Tuesday, May 21 and is anticipated to continue until Thursday, May 23

    Project Updates

    Water Main Replacement

    Saint Paul Regional Water Services (SPRWS) will replace all lead water services from the water main to the property line (public right of way portion) as part of this project. If you have a lead water service from the property line to the water meter at your property (private portion), you can sign-up for SPRWS’ Lead Free Program to have this portion replaced at no cost. For additional information and to sign up for the Lead Free Program, visit www.stpaul.gov/water or call SPRWS’ Lead Free team at 651-266-6280.


    As part of the road reconstruction project, SPRWS will be replacing the water main on Wheelock Parkway.

    To continue to ensure the reliability of our system, SPRWS will be replacing the existing 8" cast iron water main with 8" ductile iron pipe.  The scope of the main replacement work is as follows:

    • Replace approximately 1,200 feet of 8" cast iron water main with 8" ductile iron
    • Replace necessary valves and hydrants within the project area

    SPRWS Contacts