Description
The project is a network of mostly on-street electric vehicle chargers to serve Evie carshare and public charging for personal electric vehicles. Each EV Spot includes 4-6 on-street parking spots. Most locations have two dual-port level 2 chargers, with one charger dedicated to Evie carshare and the other dedicated to public charging. A limited number of locations near regional destinations or freeways require additional parking spots in order to provide fast charging. The EV Spots also include electrical service cabinets in the boulevard, and in some cases an additional transformer cabinet.

Location
The network includes 38 EV Spot locations in Saint Paul and 32 in Minneapolis.

Timeline
2021 - 2024

For more information about the project, visit www.stpaul.gov/EV.

Tags

    Construction Update

    The final locations are being constructed in 2024. These Saint Paul locations include:

    • Aurora and Rice
    • Carleton and University
    • Cesar Chavez
    • St Joseph's Lane and 7th 
    • Jackson and 14th
    • Selby and Dunlap
    • Stryker and King

    Two additional locations are being added at Saint Paul recreation centers:

    • Arlington Hills
    • Jimmy Lee